1 00:00:11,910 --> 00:00:08,870 fyodor your chicken will be ev1 wearing 2 00:00:14,629 --> 00:00:11,920 the red stripe suit alexander sasha 3 00:00:19,189 --> 00:00:14,639 maisirkin will be ev2 wearing the blue 4 00:00:19,199 --> 00:00:30,390 they will egress the piers or dc1 module 5 00:00:34,709 --> 00:00:32,709 sasha will be the first crew member out 6 00:00:36,470 --> 00:00:34,719 fyodor will hand out the indicator 7 00:00:39,990 --> 00:00:36,480 science hardware 8 00:00:45,430 --> 00:00:40,000 along with the pressurized container and 9 00:00:48,389 --> 00:00:47,029 the two crew members will translate 10 00:00:51,990 --> 00:00:48,399 around 11 00:00:53,350 --> 00:00:52,000 dc1 to strela one's boom and translate 12 00:00:56,630 --> 00:00:53,360 up to the 13 00:00:58,389 --> 00:00:56,640 service module and fgb interface 14 00:00:59,990 --> 00:00:58,399 fyodor will hold the pressurized 15 00:01:03,110 --> 00:01:00,000 container 16 00:01:04,229 --> 00:01:03,120 while sasha translates up to a 17 00:01:11,590 --> 00:01:04,239 coors 18 00:01:16,070 --> 00:01:13,750 there he will connect a series of 19 00:01:24,789 --> 00:01:16,080 connectors to test out the coors 20 00:01:29,030 --> 00:01:27,270 once that's complete he will inform mcc 21 00:01:30,390 --> 00:01:29,040 moscow that he has connected the 22 00:01:32,469 --> 00:01:30,400 connectors 23 00:01:34,550 --> 00:01:32,479 he will translate back to the 24 00:01:36,870 --> 00:01:34,560 pressurized container 25 00:01:40,069 --> 00:01:36,880 and along with fyodor will translate up 26 00:01:42,310 --> 00:01:40,079 to the fgb 27 00:01:43,670 --> 00:01:42,320 attach the pressurized container to the 28 00:01:49,109 --> 00:01:43,680 fgb 29 00:01:54,230 --> 00:01:51,109 they will open up an mli 30 00:01:56,950 --> 00:01:54,240 panel and disconnect 31 00:02:01,830 --> 00:01:56,960 panel number two flow control valve 32 00:02:06,469 --> 00:02:04,550 they will remove number two flow control 33 00:02:08,389 --> 00:02:06,479 valve 34 00:02:10,790 --> 00:02:08,399 and temp stoit 35 00:02:13,510 --> 00:02:10,800 open up the pressurized container 36 00:02:16,869 --> 00:02:13,520 and retrieve the spare flow control 37 00:02:20,390 --> 00:02:16,879 valve and install it on the fgb 38 00:02:22,949 --> 00:02:20,400 and remating the connector 39 00:02:24,630 --> 00:02:22,959 they will stow the failed flow control 40 00:02:35,190 --> 00:02:24,640 valve 41 00:02:40,630 --> 00:02:37,830 once that's complete they will install 42 00:02:42,229 --> 00:02:40,640 cable clamps along the fgb 43 00:02:49,589 --> 00:02:42,239 to be utilized 44 00:03:03,190 --> 00:02:51,030 they will retrieve the pressurized 45 00:03:22,949 --> 00:03:05,509 they will install an additional cable 46 00:03:27,670 --> 00:03:25,430 once that's complete sasha will 47 00:03:29,990 --> 00:03:27,680 translate back to the coors 48 00:03:33,509 --> 00:03:30,000 connector panel and demate the 49 00:03:45,430 --> 00:03:33,519 connectors that he made it prior to this 50 00:04:08,070 --> 00:03:49,110 crew members will translate back down 51 00:04:13,429 --> 00:04:11,110 and back around dc1 to temp stow 52 00:04:15,910 --> 00:04:13,439 the pressurized container 53 00:04:25,350 --> 00:04:15,920 they will retrieve the indicator science 54 00:04:29,749 --> 00:04:27,430 with the science hardware 55 00:04:39,430 --> 00:04:29,759 they will translate back up to 56 00:04:56,390 --> 00:04:41,590 here they will install 57 00:05:01,110 --> 00:04:58,310 once it's installed the indicator 58 00:05:02,710 --> 00:05:01,120 science hardware will be deployed 59 00:05:04,710 --> 00:05:02,720 and a connector 60 00:05:13,749 --> 00:05:04,720 from the indicator science hardware will 61 00:05:16,710 --> 00:05:15,510 the crew members will then 62 00:05:18,870 --> 00:05:16,720 translate 63 00:05:32,070 --> 00:05:18,880 around mrm2 64 00:05:36,310 --> 00:05:34,390 it will translate back down strella one 65 00:05:42,390 --> 00:05:36,320 spoon 66 00:05:46,790 --> 00:05:44,870 back at dc1 they will translate to the 67 00:05:50,310 --> 00:05:46,800 eva ladder 68 00:05:52,390 --> 00:05:50,320 and stow the nasa levos panel number 2 69 00:05:58,550 --> 00:05:52,400 and the pressurized container 70 00:06:03,430 --> 00:06:00,710 they will translate 71 00:06:06,390 --> 00:06:03,440 out to the sm or service module and 72 00:06:09,670 --> 00:06:06,400 install a series of gap spanners 73 00:06:34,230 --> 00:06:09,680 between handrails to be utilized on a 74 00:06:38,710 --> 00:06:36,550 after the gap spanners are installed 75 00:06:41,510 --> 00:06:38,720 they will demate two connectors from 76 00:06:44,390 --> 00:06:41,520 photon gamma from the monoblock and 77 00:06:52,150 --> 00:06:44,400 remove photon gamma from the monoblock 78 00:06:56,469 --> 00:06:53,909 i'll translate to the smaller diameter 79 00:06:59,110 --> 00:06:56,479 of the service module in tempstow photon 80 00:07:02,950 --> 00:07:01,430 then translating around 81 00:07:05,670 --> 00:07:02,960 the smaller diameter of the service 82 00:07:25,270 --> 00:07:05,680 module they will install two additional 83 00:07:29,430 --> 00:07:27,589 once the gap spanners are installed 84 00:07:31,830 --> 00:07:29,440 the crew members will translate back to 85 00:07:33,589 --> 00:07:31,840 photon gamma 86 00:07:36,629 --> 00:07:33,599 retrieve it 87 00:07:38,390 --> 00:07:36,639 and translate it back to dc1 88 00:07:40,870 --> 00:07:38,400 where 89 00:07:44,309 --> 00:07:40,880 fyodor will ingress 90 00:07:48,390 --> 00:07:44,319 retrieve photon gamma 91 00:07:49,670 --> 00:07:48,400 stow it inside dc1 and sasha will follow 92 00:07:52,150 --> 00:07:49,680 ingressing